πŸ“’ IMPORTANT UPDATE FOR ALL WAFFLE CUSTOMERS

We’ve clearly mentioned the delay timeline on every product page.
Each waffle piece is made fresh in batches, not picked from ready stock β€” which is why dispatch follows a queue system.

Our standard production + delivery window is 7–12 days, depending on the batch load.
Exchanges may take slightly longer for the same reason β€” we don’t reuse returned pieces.

Below is the complete production + dispatch breakdown (25 March – Present) for full transparency.


πŸ“¦ FULL PRODUCTION + DISPATCH TIMELINE

(25 March – Present)
For: Hallo Collapse Waffle / Core Washed Waffle / Centipede Waffle / Seraph Waffle / Olive Waffle


🧡 Phase 1: 25 March – 5 April (Batches 1–3)

Timeline Stage Details Status
25 Mar – 27 Mar Material Sourcing Waffle fabric procurement + dyeing initiated βœ” Completed
28 Mar – 30 Mar Fabric Processing Washing, texture setting & GSM finishing βœ” Completed
31 Mar – 2 Apr Cutting All 5 variations cut batch-wise βœ” Completed
3 Apr – 4 Apr Stitching Initial construction for Batch 1–3 βœ” Completed
5 Apr QC & Finishing Thread checks, fit correction, wash finishing βœ” Completed
6 Apr – 8 Apr Dispatch All Batch 1–3 orders shipped βœ” 100% Dispatched

🧡 Phase 2: 6 April – 12 April (Batches 4–6)

Timeline Stage Details Status
6 Apr – 7 Apr Batch Allocation Orders assigned to Batch 4–6 βœ” Completed
8 Apr – 9 Apr Cutting & Prep Panel cutting + wash prep βœ” Completed
10 Apr – 11 Apr Stitching Majority construction completed βœ” Completed
12 Apr QC & Finishing Final detailing + checks βœ” Completed
13 Apr – 15 Apr Dispatch Batch 4–6 orders shipped βœ” 100% Dispatched

🧡 Phase 3: 13 April – Present (Batches 7–9)

Timeline Stage Details Status
13 Apr – 14 Apr Batch Allocation Orders assigned to Batch 7–9 βœ” Completed
15 Apr – 17 Apr Cutting & Washing Fabric processing + panel prep ongoing βœ” Completed
18 Apr – 20 Apr Stitching Majority pieces under construction πŸ”„ In Progress
21 Apr – 22 Apr QC & Finishing Quality checks + wash finishing ⏳ Ongoing
23 Apr onwards Packing & Dispatch Orders being shipped in sequence ⏳ Dispatching Soon

πŸ“Œ FINAL STATUS RECAP

Order Batch Status
Batch 1 – 3 (25 Mar – 5 Apr) βœ” 100% Dispatched
Batch 4 – 6 (6 Apr – 12 Apr) βœ” 100% Dispatched
Batch 7 – 9 (13 Apr – Present) ⏳ In Stitching + QC β†’ Dispatching in queue

πŸ“ NOTE FOR CURRENT ORDERS

Due to high demand + batch production system, some orders may take slightly longer than usual.
We are dispatching continuously, back-to-back, while ensuring every piece meets our quality standards.

We understand the wait β€” and we truly appreciate your patience.
Every waffle piece is being crafted to make sure it’s worth it when it reaches you.

Β 

"Hey! No need to worry about your order β€” our executive will reach out to you shortly regarding your pre-order piece."

Fallen Angel Denim

"Stay updated in real-time! Batch 1 & 2 have been successfully delivered β€” read more below."

READ MORE